Join Books.org — it's free

Individual Buildings & Designs - General & Miscellaneous, Ancient Architecture - General & Miscellaneous, Ancient Egyptian Sites, Tombs, & Ruins, African Architecture
The Large Egyptian Pyramids by H. J. De Haan β€” book cover

The Large Egyptian Pyramids

by H. J. De Haan
Available on Bookshop Write a review

Books.org participates in affiliate programs including Bookshop.org and the Amazon Services LLC Associates Program. We may earn a commission from qualifying purchases made through links on this page, at no additional cost to you.

Log in to track your reading progress.

Overview

The building process of the Egyptian pyramids has been the subject of many publications. However, a thorough review of this literature reveals that only certain aspects of this process have been studied in isolation, without taking into account the interaction between various activities involved, such as quarrying, transportation and building and without a sound quantitative basis. The present study aims at filling this gap by means of an integrated mathematical model. Attention is focussed on the largest pyramid, the one built by Cheops. The model simulates an efficient project co-ordination by balancing supply and demand of the building material, with all the activities related to the growth of the pyramid and by assuming a constant total workforce. It enables the reader to determine the effect of different building methods and the productivity of the workers. Three building methods have been studied, successively making use of a linear ramp, of a spiral ramp and of levers. These methods are compared in terms of the number of men and man-years required. Calculations have been carried out for two sets of input data, indicated as base case and maximum case.

Synopsis

The building process of the Egyptian pyramids has been the subject of many publications. However, a thorough review of this literature reveals that only certain aspects of this process have been studied in isolation, without taking into account the interaction between various activities involved, such as quarrying, transportation and building and without a sound quantitative basis. The present study aims at filling this gap by means of an integrated mathematical model. Attention is focussed on the largest pyramid, the one built by Cheops. The model simulates an efficient project co-ordination by balancing supply and demand of the building material, with all the activities related to the growth of the pyramid and by assuming a constant total workforce. It enables the reader to determine the effect of different building methods and the productivity of the workers. Three building methods have been studied, successively making use of a linear ramp, of a spiral ramp and of levers. These methods are compared in terms of the number of men and man-years required. Calculations have been carried out for two sets of input data, indicated as base case and maximum case.

Reviews

There are no reviews yet. Log in to write one.

Book Details

Published
December 1, 2010
Publisher
British Archaeological Reports
Pages
125
Format
Paperback
ISBN
9781407305462

More by H. J. De Haan

Similar books